In recent decades we have successfully implemented a variety of projects with different scopes in the field of electrical, control, measurement and control technology of industrial plants. Our clients operate in different industries worldwide. Below you can find a list with a few of our recent activities, for a detailed information about specific projects please contact us directly.
Year |
Project |
Project description |
Scope of delivery |
Nation |
2015 | Combined heat and power station Leipzig | Migration of the control system |
Delivery, errection and commissioning of the complete process automation system for the new heat and power station |
DE |
2015 | Telecontrol system EVN |
Definition of a new standard equipment for the telecontrol system to catch informations of different production plants with IEC 60870-5, IEC 61850, Modbus |
Designing, engineering and tendering of telecontrol equipment |
AT |
2015 |
District heat storage Munich |
District heating accumulator with integration in a existing district heating system |
Designing and engineering of a control and automation concept including function description and diagrams as specification for the programming of the Siemens T3000 control system Commissioning and optimisation of the overall plant |
DE |
2014 | EVN SCADA System for production plants |
Superior monitoring and control system for different production plants: hydro station, wind power station, photovoltaic system, reservoir power station Collecting of data with different bus systems (IEC 60870-5, IEC 61850) and centralised analysis of the data with a redundant server system; data exchange with office network infrastructure |
Planning and preparation of tender | AT |
2014 | CCPP Bismayah 2500 MWe | Supervision and management of a new powerplant project, with two stages: Open cycle and combined cycle power station. Plant configuration: 8 GE gas turbines with 2 boilers and 2 steam turbines Total power output: around 1500MW electric power |
Together with APPA we fullfill the function of owners engineer with elaboration of tender documents, technical document review, negotiations with EPC-contractors, etc. | IQ |
2014 | AinSmara |
network and infrastructure components of a factory plant including plant wide fiber optic system, fire detection system, video surveillance system, access control system, UPS system, centralised clock system, public address system (PA) |
Designing and engineering, construction, delivery, errection supervision and commissioning of all network related infrastructure components |
AL |
2014 | WTTP Krakow | Waste Thermal Treatment Plant Krakow |
Planning and project management for all I&C related equipment including programming of the Siemens control system and commissioning |
PL |
2013 | CCPP Dohuk 1500 MWe |
Supervision and management of a powerplant project, converting from existing open cycle powerplant into a full combined cycle power station. Plant configuration: 8 GE Gasturbines with related HRSGs and 2 Steam turbines with in summary 1500 MWe |
Together with APPA we fullfill the function of owners engineer with elaboration of tender documents, technical document review, inspections, quality control, supervision of design, construction, commissioning, acceptance, project scheduling, etc. | IQ |
2013 | MZGOK Konin | Waste Thermal Treatment Plant Konin grate firing with SNCR and steam turbine | Planning and project management for all I&C related equipment including commissioning | PL |
2013 | CCPP Erbil 1500 MWe | Supervision and management of a powerplant project, converting from existing open cycle powerplant into a full combined cycle power station. Plant configuration: 8 GE Gasturbines with related HRSGs and 2 Steam turbines with in summary 1500 MWe | Together with APPA we fullfill the function of owners engineer with elaboration of tender documents, technical document review, inspections, quality control, supervision of design, construction, commissioning, acceptance, project scheduling, etc. | IQ |
2013 | Steam boilers DuPont |
Electrical and I&C equipment for two steam boilers |
Planning and project management for all electric and I&C related equipment including programming of the Siemens PCS7 control system and commissioning (including field device commissioning) | LU |
2013 | CCPP Sulaymaniyah 1500 MWe | Supervision and management of a powerplant project, converting from existing open cycle powerplant into a full combined cycle power station. Plant configuration: 8 GE Gasturbines with related HRSGs and 2 Steam turbines with in summary 1500 MWe | Together with APPA we fullfill the function of owners engineer with elaboration of tender documents, technical document review, inspections, quality control, supervision of design, construction, commissioning, acceptance, project scheduling, etc. | IQ |
2012 | Adjustment Pulp Mill Paskov | Adjustment of the pulp mill into a Swing-Capacity-Pulp Mill with installation of a waste liquor boiler, soda boiler, evaporation plant and condensing turbine | Execution and engineering of the electrical and I&C equipment, incl. erection supervision and commissioning and programming of METSO control system |
CZ |
2011 | Optimization of combustion control ESB-incineration plant Bernburg |
Optimization of combustion control of a waste incineration plant with grate, incl. flue gas cleaning with 3 lines |
Analysis, extansion and optimization of the combustion control incl. programming | DE |
2011 | Waste incineration plant Oulu | Waste incineration plant for domestic waste with incineration grate, boiler, directly fired superheater, flue gas cleaning, auxiliary plant, etc. Technical Data: Steam output: 58,7 t/h Steam pressure: 84 bar Firing thermal capacity: 47,9 MW Steam temperature: 425°C /515°C |
Execution and detailed engineering of the electrical and I&C equipment. Detailed functional engineering, incl. erection supervision and commissioning |
FI |
2010 | CCPP Venezuela Operating Manual | Two Power Plants with each 2 Gas turbines and 1 steam turbine Electrical Power: 500 MW |
Preparation of the Operating Manuals for both plants with: - General Plant Description - System Description - Requirements for operation - Operation of overall plant - Description of alarms |
VE |
2010 | Boiler plant MHTL Trinidad | Boiler plant oil/gas with 3 burners for Methanol Plant Process commissioning and execution of personal training Thermal capacity appr. 150MW |
Complete engineering, delivery and commissioning of electrical- and I&C equipment incl. delivery, configuration and commissioning of process control system and fail safe burner management system |
TT |
2010 | GTKW Darmstadt | Power Plant with 2 Gas turbines Electrical Power: 2 x 50 MW Electric: Connection to 110 kV grid, 6,3 kV switchgears, transformers, LV-switchgears, UPS |
Complete procurement and detail engineering of the electrical and I&C equipment. Including erection supervision and commissioning |
DE |
2009 | Cogeneration MVA Prague | Cogeneration and Denox-plant for waste incineration plant for domestic waste 4 lines Four incineration lines with a waste-put-through-capacity of 15 t/h and a flue gas volume of approx. 75.000 Nm³/h. |
Complete tender announcement and detailed engineering of electrical- and I&C equipment, incl. erection supervision and commissioning | CZ |
2008 | CCPP Venezuela Tamare | Power Plant with 2 Gas turbines and 1 steam turbine Electrical Power: 500 MW Power Plant DCS: ABB Symphony (Maestro and Melody) Electric: Connection to 230 kV grid, 4 kV switchgears, transformers, LV-switchgears, UPS, three emergency diesel generator Projectduration till 2011 |
Complete detail engineering and documentation for the electrical and I&C equipment. Delivery and configuration of the DCS incl. Fail safe system for the boiler protection. Execution of a detail FAT with the DCS and a further FAT after erection in a container together with the switchgears Detail engineering of the unit protection for each generator incl. precommissioning tests |
VE |
2008 | CCPP Venezuela Bachaquero | Power Plant with 2 Gas turbines and 1 steam turbine Electrical Power: 500 MW Power Plant DCS: ABB Symphony (Maestro and Melody) Electric: Connection to 230 kV grid, 4 kV switchgears, transformers, LV-switchgears, UPS, three emergency diesel generator Projectduration till 2011 |
Complete detail engineering and documentation for the electrical and I&C equipment. Delivery and configuration of the DCS incl. Fail safe system for the boiler protection. Execution of a detail FAT with the DCS and a further FAT after erection in a container together with the switchgears Detail engineering of the unit protection for each generator incl. precommissioning tests |
VE |
2008 | CCPP Venezuela Enelven Processengineering | Two Power Plants with each 2 Gas turbines and 1 steam turbine Electrical Power: 500 MW |
Processengineering with P&ID-check System Description Function Chart Overview Unit Coordination Description Start-up and Shut down sequences |
VE |
2008 | EBS-Incineration Plant Bernburg |
Erection of a fuel surrogate-incineration plant at facility Solvay / Bernburg Electric: 6 kV switchgear, transformers, switchgears, UPS, emergency diesel generator |
Complete basic- and detailed engineering of electrical and I&C technical - engineering of announcement and carrying out - delivery of comblete DCS - commissioning till handing over of all electrical and I&C-equipment |
DE |
2008 | Cogeneration- and Denox-Plant Praha | Cogeneration and Denox-plant for waste incineration plant for domestic waste 4 lines Four incineration lines with a waste-put-through-capacity of 15 t/h Steam Turbine 18 MW Air cooled condenser District heating Fluegas heat recuperation Denox-plant Electric: switchgears, unit-transformer and transformers, extention of DCS Project term till 2011 |
Complete project management ofelectrical- and I&C-systems incl. basicengineering, procurement and commissioning of all electrical-, measuring and control equipments as well as the development of all detail function diagrams | CZ |
2007 | DeDioxin Waste Incineration Plant Prague |
DeDioxin-plant for waste incineration plant for domestic wastein prague: Four incineration lines with a waste-put-through-capacity of 15 t/h Flue gas volume: approx. 75.000 Nm³/h. |
Complete announcement and detailed engineering of electrical- and I&C equipment, incl. erection control and commissioning | CZ |
2007 | EBS/Vienna Steam Line Control and Optimization |
Implementation of a higher-ranking steam line control for the complete facility of the toxic waste incineration plant with 4 fluidised bed boilers and 2 rotary kiln, such as steam turbine and district heating station. Aims: raising of produced energy quantity, optimization of the generate electricity of produces steam, such as minimization of electricity-import from national grid. |
Delivery, erection, programming and optimization of a higher-ranking steam line control | AT |
2007 | Repowering Wien | Control system Siemens T3000 for 2 gas turbines combined cycle inclusive Denox-installation CCPP: Combined cycle 700MW |
Basic engineering, functional engineering and software configuration of Siemens Control system T3000 carrying out of FAT with a Simulator in Erlangen and commissioning in Vienna |
AT |
2007 | CCPP Timelkam | Control system Siemens T3000 for 2 gas turbines combined cycle inclusive Denox-installation CCPP: Combined cycle 400MW |
Basic engineering, functional engineering and software configuration of Siemens Control system T3000 FATwith a Simulator in Erlangen |
AT |
2006 | Deir Ali Syrien | Gas turbine plant Combined Cycle |
Basic engineering and drawing of P&I-Schematas support for functional engineering |
SY |
2007 | Oil tank depot Matzen | Renewal of oil tank depot incl. pumping stations and production stations in Matzen/lower austria Project term till 2010 |
Complete project management of electrical and I&C-System incl. Basic engineering anddetail engineering, commissioning of all electrical-, measuring- and control equipment for the complete plant | AT |
2006 | Oil tank depot Auersthal | Renewal of oil tank depot incl. pumping stations and production stations in Auersthal/NÖ Poject term till2009 |
Complete project management of electrical and I&C-technical incl. Basic engineering and detail engineering, commissioning of all electrical-, measuring- and control equipmentsfor the complete plant | AT |
2007 | Rabai GT Projekt Kenya | 2 Gas turbines open cycle 2x35MW Electric: 11kV switchgear, 80MVA blocktransformer, connection to 132kV, protection Mombasa, Kenya |
Basic engineering and projectmanagement E- and I&C-System | KE |
2007 | Waste incineration plant Zistersdorf | Waste incineration plant for domestic waste 1 line Thermal capacity appr. 1x60MW Projectduration till 2010 Waste incineration plant for refuse derived fuel 1 line Thermal capacity appr. 1x100MW |
Projectmanagement, supervision and commissioning Electrical- and control system | AT |
2007 | Waste incineration RVH Heiligenkreuz | Fluidized bed incineration plant for refuse derived fuel 1 line Thermal capacity appr. 1x100MW |
Basic engineering and projectmanagement Electrical- and control Systems | AT |
2007 | Waste incineration RHKW Linz | Fluidized bed incineration plant for refuse derived fuel 1 line Thermal capacity appr. 1x80MW Projectduration till 2011 |
Basic engineering and projectmanagement, erection supervision, commissioning of Electrical- and I&C-System | AT |
2006 | DeDioxin-Plant Praha | DeDioxin-plant for waste incineration plant for domestic waste 4 lines Four incineration lines with a waste-put-through-capacity of 15 t/h Consists of: catalysers, burner unit, soot blower unit, flue gas fan Electric: switchgears, transformers, extention of DCS, field instruments, erection Project term till 2008 |
Complete project management and procurement of electrical- and I&C-systems incl. basic-engineering and commissioning of all electrical-, measuring and control equipments for the scope of the dedioxin plant as well as the development of all detail function diagrams | CZ |
2006 | Maritza East 3 | Coal fired power plant with a capacity of 840 MW | Delivery and commissioning frequency converters | BG |
2006 | Waste incineration plant Vienna MVA3 Pfaffenau |
Waste incineration plant for domestic waste 2 lines Thermal capacity appr. 2x55MW Electric: 10kV switchgear, 12MVA transformer, connection to 20kV grid, protection Project term till 2009 |
Complete project management ofelectrical- and I&C-systems incl. basic- engineering and commissioning of all electrical-, measuring and control equipments for the scope of flue gas cleaning just as the development of all detail function diagrams | AT |
2006 | Data processing-logistic-system/A | Logistic-System for an automated waste delivery | Concept preparation, announcement and carrying-out-control |
AT |
2006 | Waste incineration plant Dürnrohr Line3 | 3. line of the waste incineration plant incl. flue gas cleaning plant, connection to the existing plant DCS:ABB Symphony (Melody and Maestro) Electric: 10kV switchgear, 40MVA blocktransformer, connection to 110kV grid, protection Thermal capacity appr. 1x90MW roject term till 2010 |
Complete project management, procurement, basic- and detailengineering of all electrical-, measuring- and control equipments incl. commissioning and optimization Delivery and Configuartion of the DCS |
AT |
2006 | Waste incineration Frohnleiten | Fluid bed incineration plant for refuse derived fuel 1 line Electric: 6,3 and 10kV switchgear, 2x20MVA blocktransformer, connection to 110kV grid, protection Thermal capacity appr. 2x80MW |
Basic engineering and projectmanagement Electrical- and I&C-System | AT |
2005 | Boiler plant OMAN | Boiler plantoil/gas with 3 burners Thermal capacity 2 x 50MW Project term till2007 |
Complete engineering, delivery and commissioning of electrical- and I&C-System inclusive delivery, configuration and commissioning of fail safe System and Burner Management System |
OM |
2005 | Nasserieh/Zayzoun Syria | 2 x 3 Gas turbine plant incl. Heat Recovery Steam Generator, condenser, water/steamcycle and steam turbine Electrical capacity appr. 2x400 MW |
Basic engineering and development of detail function diagrams for water steam main equipment and unit coordination for one push button start of the entire plant Carrying out of a detail FAT at Siemens in Karlsruhe |
SY |
2005 | Power plant Theiß | 2 Gas turbines Electric: 10kV generator switch, 2x70MVA blocktransformer, connection to 110kV, protection Electrical capacity appr. 2x70MW Project term till2008 |
Complete project management ofelectrical and I&Csystems incl. basic- and detail engineering, erection supervision and commissioning | AT |